The Allen Project is nearing completion and I wanted to post some pictures and send out some big ‘thank you’s to those who have worked on the project. First, I want to post some of the pictures for during the construction.

Front Yard Flower Bed
It is always fun when we do the excavation and the outdoor living spaces start to take shape. From this point, though, there is still a lot of work to do, but when you finally get to the point where you are adding the mulch and cleaning up the edges, it is always such an exhilirating and satisfying feeling. I love what I do!

Flag Installed in Front Flower Bed
This is a picture of the flag pole installed in the front yard flower bed. I want to thank
for the install. They did a great job. They were clean and easy to work with, and they were very flexible with their scheduling and helped us to keep working toward our deadline by being flexible.
Another contractor that was very quick to respond and even quicker to work us into their schedule was
Lynn Woodward Electric. They were quick, clean and very reasonably priced.
The sitting walls, pavers and curbing were all done by

and they have done a superb job. They are probably the best block guys in the state. Their work is all finished and I am waiting until we are finished to post any other progress pictures.

Allen Sitting Wall Foundation
We installed plants today and things should be pretty much wrapped up on Monday when the pergola is installed. The only thing we will have left will be the retractable shades that are going on the structure. Four days ahead of schedule!